110 Yonge Street

20160514_190937
20170413_144112
20160606_205212
20160606_205211
Project Description 
​
Summer 2016 
  • New concrete masonry wall for mechanical room  
    • Mastic installation
    • Masonry wall
    • Epoxy coating
    • Drain replacement
    • New mechanical doo​​
Consultant: CH2M Hill
​
Winter 2015
  • Parking garage mastic replacement
    • Concrete slab repairs
    • Mastic removal and replacement on P1&P2 levels
    • Elastomeric installation on P3 ramp
    • Foundation wall epoxy injection 
    • Painting of entire garage
Consultant: CH2M Hill