Project Description 
​
Spring 2017 
  • Entrance ramp Epoxy replacement 
    • Concrete slab repairs
    • Polyurethane-methacrylate waterproofing system installation
Consultant: Stephenson Engineering Ltd
 
Summer 2015
  • Parking garage and loading dock Repairs
    • Concrete slab repairs
    • Heavy duty epoxy waterproofing installation
    • Steel plate installation
    • Trench Drain repairs
    • Interior leaking crack repairs
    • Foundation wall injection 
    • Exterior walkway replacement
Consultant: Stephenson Engineering Ltd