4711 Yonge Street

20171210_191324
20171029_092736
20170729_160222
20170729_161606
20170930_150739
20170825_124044
20170912_074145
20170926_072541
20160419_105634
20160510_143639
20160421_122309
Project Description 
​
Winter 2017 
  • P2 level slab on grade epoxy re-coating​
 
Spring-Fall 2017
  • Expansion joint repairs 
    • Ashpalt replcement
    • Interior office temporary water protection during repairs
    • Trench drain replacement
    • interior mastic repairs
    • column repairs
Consultant: Stephenson Engineering Ltd
​
Spring-Fall 2016
  • Ramp and exterior deck expansion joint repairs 
    • Concrete slab repairs
    • Mastic replacement 
    • Heating cable splicing  
    • Elastomeric traffic topping replacement 
    • Heating cable installation
    • Granite paver replacement 
    • Drain installations
Consultant: Stephenson Engineering Ltd
​
Winter 2016
  • Interior parking garage mastic repairs 
    • Concrete slab repairs
    • Ramp Mastic replacement  
    • Localized mastic replacement
    • Hot applied waterproofing repairs
    • Mechanical expansion joint replacement
    • Heating cable installation
    • Drain replacements
    • Pipe drainage system replacement 
Consultant: Stephenson Engineering Ltd
​
​